Pengendalian Persediaan Bahan Baku Jenis Subparts Di Pt Mada Wikri Tunggal

Setyawan, Wasis Akbar and , Ratnanto Fitriadi, S.T., M.T (2024) Pengendalian Persediaan Bahan Baku Jenis Subparts Di Pt Mada Wikri Tunggal. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
D600200240_WASIS AKBAR SETYAWAN_NASKAH PUBLIKASI TERBARU.pdf

Download (557kB)
[img] PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Naskah Publikasi_Wasis Akbar Setyawan.pdf
Restricted to Repository staff only

Download (262kB)

Abstract

PT Mada Wikri Tunggal –Plant 1 is a company operating in the field metal component. One of the raw materials used in the production process is subparts. The problem faced is the fluctuation in consumer demand which causes raw material inventory control activities subparts running is not optimal and experiencing stockout as well as overstock thus disrupting the production process. This research was conducted to examine and determine optimal raw material inventory control planning methods. The method used in this research is the ABC classification method,minimum-maximum stock level, and periodic order quantitiy. Based on the calculation results, it was found that the minimum costs for the Nut Special 6MM PJ 5.5-BB (KPH) and Rubber P Step BB items were the costs using the 2 companies' actual method. For the Nut Welding M6 MM BB item, the minimum inventory cost is the cost using the POQ method.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Inventroy Control, ABC Classification, Minimum-Maximun Stock Level, Periodic Order Quantity
Subjects: T Technology > TI Industrial Engineering
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: WASIS AKBAR SETYAWAN
Date Deposited: 13 May 2024 06:36
Last Modified: 13 May 2024 06:38
URI: http://eprints.ums.ac.id/id/eprint/123570

Actions (login required)

View Item View Item