Wicaksono, Fadli Bagus and , Gurawan Djati Wibowo, S.T., M.Eng. (2023) Evaluasi Dan Desain Ulang Instalasi Pengolahan Air Limbah Pada Rumah Sakit Pku Muhammadiyah Surakarta. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (294kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (519kB) |
|
PDF (Bab I)
BAB 1.pdf Download (95kB) |
|
PDF (Bab II)
BAB 2.pdf Restricted to Repository staff only Download (99kB) |
|
PDF (Bab III)
BAB 3.pdf Restricted to Repository staff only Download (504kB) |
|
PDF (Bab IV)
BAB 4.pdf Restricted to Repository staff only Download (120kB) |
|
PDF (Bab V)
BAB 5.pdf Restricted to Repository staff only Download (613kB) |
|
PDF (Bab VI)
BAB 6.pdf Restricted to Repository staff only Download (45kB) |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (89kB) |
|
PDF (Surat Pernyataan Publikasi)
Surat-Pernyataan-Publikasi-02-03-2023 (1).pdf Restricted to Repository staff only Download (304kB) |
Abstract
Hospital waste is a toxic hazardous material (B3) which can pollute the surrounding environment. A hospital requires a good Wastewater Treatment Plant so that the outlet output from sewage treatment meets the available quality standards. This study was conducted at PKU Muhammadiyah Surakarta Hospital type B with a discharge of 80,000 liters of wastewater per day. For now, waste treatment at PKU Muhammadiyah Surakarta Hospital uses Aerobic and the Rapid Sand Filter & Granular Activated Carbon (GAC) filter system which will be compared with the redesign of the waste treatment installation using the DEWATS method. In this study, the method used was the DEWATS design method which has two filtrations, namely the Anaerobic Biofilter and the Aerobic Pond along with the Polishing Pond. This study also produced a feasibility test for wastewater treatment plants for the next 10 years with the parameters of processed waste in the form of COD and BOD5 according to quality standards. There are also steps taken to collect data in the form of daily waste discharge, processing, and processing results at the existing wastewater treatment plant. After the research was carried out, the parameters obtained were almost the same for the BOD and COD of the existing wastewater treatment plant of 19 mg/L with a quality standard of 100 mg/L and 9 mg/L with a quality standard of 30 mg/L, while for the results of the treatment plant the redesigned waste water is 21.4 with a quality standard of 100 mg/L and 7 mg/L with a quality standard of 30 mg/L. It can be concluded that both the existing WWTP and the redesigned WWTP are capable of processing hospital waste for up to 10 years in the future.
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | Evaluation of Type B Hospital WWTP, Wastewater Treatment, WWTP Redesign. |
Subjects: | T Technology > TA Civil Engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | FADLI BAGUS WICAKSONO |
Date Deposited: | 18 Aug 2023 03:39 |
Last Modified: | 18 Aug 2023 03:39 |
URI: | http://eprints.ums.ac.id/id/eprint/116083 |
Actions (login required)
View Item |