Al-Faruq, Muhammad Irvan Helmi and , Ir. Ahmad Kholid Al Ghofari, S. T., M. T (2023) Analisis Pengukuran Beban Kerja Mental Menggunakan Metode Nasa-TLX Dan Rsme Serta Pengukuran Beban Kerja Fisik Menggunakan Metode CVL (Studi Kasus CV.Sabar Bersaudara). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Surat Pernyataan Publikasi)
Surat Unggah Helmi.pdf Restricted to Repository staff only Download (125kB) | Request a copy |
|
PDF (Naskah Publikasi)
D600190063_Muhammad Irvan Helmi Al-Faruq_Naskah Publikasi.pdf Download (383kB) |
Abstract
CV.Sabar Bersaudara is a company that produces concentrate and organic fertilizer products located in Pati, Central Java. The purpose of this study was to determine the level of mental workload experienced by workers based on measurements using the NASA-TLX and RSME methods, then to determine the level of physical workload experienced by workers based on measurements using the CVL method and provide suggestions for improvements to workload problems. The methods used in this study are NASA-TLX and RSME for measuring mental workload and the CVL method is used for measuring physical workload. The results of this study indicate that based on measuring mental workload using the NASA-TLX method, an average score of 68.2 is obtained which is categorized as high, for the RSME score results an average score of 84.8 is categorized as a large effort. . As for the results of measuring physical workload using the CVL method, an average score of 37.7 was obtained which was categorized as high and workers experienced fatigue. Proposals for improvements that can be given to mental workload problems are such as providing music entertainment, giving bonuses, completing office facilities and rearranging and updating work systems/job desks. Proposed improvements to physical workload problems are such as providing benches/chairs for workers, providing hand trolly tools to make material handling easier, increasing the number of workers in the production section and making improvements to factory layout facilities.
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | Workload, Workload Measurement NASA-TLX, RSME, CVL |
Subjects: | T Technology > TI Industrial Engineering |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | MUHAMMAD IRVAN HELMI AL-FARUQ |
Date Deposited: | 12 Aug 2023 04:36 |
Last Modified: | 12 Aug 2023 04:36 |
URI: | http://eprints.ums.ac.id/id/eprint/115278 |
Actions (login required)
View Item |