Pengendalian Waktu Dan Biaya Dengan Menggunakan Metode Precedence Diagram Method (PDM) Pada Pelaksanaan Gedung(Studi Kasus: Proyek Pembangunan Gedung Fakultas Farmasi Universitas Wahid Hasyim Semarang Tahun Anggaran 2022)

Hakim, Zukhruf Syamil Basayyaf and , Ir. H. Muh Nur Sahid, M.T., M.M. (2023) Pengendalian Waktu Dan Biaya Dengan Menggunakan Metode Precedence Diagram Method (PDM) Pada Pelaksanaan Gedung(Studi Kasus: Proyek Pembangunan Gedung Fakultas Farmasi Universitas Wahid Hasyim Semarang Tahun Anggaran 2022). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
Naskah Publikasi Ilmiah_Zukhruf Syamil.pdf

Download (1MB)
[img] PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf
Restricted to Repository staff only

Download (359kB) | Request a copy

Abstract

Control is a function of project management so that work runs smoothly without a hitch. This study discusses controlling the time and cost of the building project for the building of the Faculty of Pharmacy, Wahid Hasyim University Semarang in 2022. There are several methods in this research, the concept of the value of the results to determine project performance, rescheduling with the precedence diagram method (PDM), and optimization with the crashing method. The results of the 25th week evaluation study showed a delay of -3.070%. Then the analysis of the result value concept method obtained a cost performance index (CPI) of 0.89 and a time performance index (SPI) of 0.93. Both values indicate that the project is experiencing time delays and cost losses. Estimated Time Completion (ETC) is IDR 34,140,839,947. Estimated All Completion (EAC) which is IDR 72,488,057,584. Estimate Temporary Schedule (ETS) was 19 weeks. Estimate All Schedule (EAS) is 44 weeks. Reschedule method Precedence Diagram Method (PDM) obtained a critical time of 113 days. Optimizing the time and cost of the crashing method of working overtime for 3 hours can shorten 28 days with a charge IDR 68,333,458,223 difference in costs IDR 270,630,006 from the initial BAC.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Control, Time, Cost, Result Value Concept, PDM, Crashing, Optimization
Subjects: T Technology > TA Civil Engineering
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: ZUKHRUF SYAMIL BASAYYAF HAKIM
Date Deposited: 19 May 2023 23:50
Last Modified: 19 May 2023 23:50
URI: http://eprints.ums.ac.id/id/eprint/112532