Satyanegara, Fitri Brillian and , Ir. Muhammad Nur Sahid, M.M., M.T. (2022) Analisis Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) pada Proyek Pembangunan Gedung Rawat Inap 4 Lantai Rumah Sakit Brayat Minulyo Surakarta Ditinjau dari Waktu dan Biaya. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI_FITRI BRILLIAN. (ttd).pdf Download (2MB) |
|
PDF (Surat Pernyataan Publikasi)
Surat-Pernyataan-Publikasi-September-2022 copy.PDF Restricted to Repository staff only Download (254kB) |
Abstract
Work safety means a person's way of protecting themselves or others because the existing workload requires a worker to receive such protection so that they can work optimally. To overcome work accidents, the company must implement a good and firm work system. Therefore, it is necessary to implement an Occupational Health and Safety Management System (SMK3) in a project to increase protection for workers (PP number 50 of 2012). Government Regulation Number 50 of 2012 is a national standard on how to implement an occupational health and safety management system. This regulation is a derivative of Law Number 13 of 2003 concerning Manpower (State Gazette of the Republic of Indonesia of 2003 Number 39, Supplement to the State Gazette of the Republic of Indonesia Number 4279) and all derivatives of Law 1 of 1970 which discusses work safety (Gazette of the Republic of Indonesia). Republic of Indonesia Number 2918). Risk analysis according to the Minister of Public Works Regulation Number 5 of 2014 concerning Guidelines for SMK3 Construction in the Public Works Sector, in the construction project of a 4-storey inpatient building at the Brayat Minulyo Hospital, Surakarta, there are 4 risk values in the "Low" category and 4 risk values in the "Medium" category. For the K3 costs required for the 4-floor inpatient construction project at the Brayat Minulyo Hospital, Surakarta, Rp. 165,678,289.27. So the total percentage of the K3 budget in the construction project of the 4-storey inpatient building at the Brayat Minulyo Hospital in Surakarta carried out by PT. Jaya Arnikon is 0.62% of the total contract value.
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | Safety Risk, Occupational Health (K3), Construction of a 4-Story Building. |
Subjects: | T Technology > TA Civil Engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | FITRI BRILLIAN SATYANEGARA |
Date Deposited: | 28 Oct 2022 03:55 |
Last Modified: | 28 Oct 2022 03:55 |
URI: | http://eprints.ums.ac.id/id/eprint/105232 |
Actions (login required)
View Item |