Analisis Beban Kerja Mental Pekerja Menggunakan National Aeronautics And Space Administration Task Load Index Di Pt. Pura Nusapersada

, Yusakh Ivanovic and , Rijal Ari Murti Choirun Niam and , Aisyah Zahra Firdausi (2022) Analisis Beban Kerja Mental Pekerja Menggunakan National Aeronautics And Space Administration Task Load Index Di Pt. Pura Nusapersada. Program Studi Teknik Industri Fakultas Teknik UMS, Universitas Muhammadiyah Surakarta.

[img] PDF (PKM-AI)
D600160105.pdf

Download (1MB)

Abstract

The purpose of this research is to determine the indicator of the mental workload received by workers in the boiler unit, so that it can be known and used as an improvement by looking at which indicator is most dominant accepted by workers in the unit Boiler. With NASA-TLX method can measure how much mental workload is received by each worker in the Boiler Unit. NASA-TLX can identify any mental workload based on 6 dimensions namely Mental needs, physical needs, time requirement, Performance, level of effort and frustration level. The average score

Item Type: Other
Uncontrolled Keywords: Beban Kerja Mental, Enam Dimensi, NASA-TLX, Unit Boiler
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management
T Technology > TI Industrial Engineering
Depositing User: Cahyana K. Widada
Date Deposited: 25 Aug 2022 06:42
Last Modified: 25 Aug 2022 06:42
URI: http://eprints.ums.ac.id/id/eprint/104535

Actions (login required)

View Item View Item