, Robi Setyawan and , Heni Muslimatun and , Yan Anton Prayogo (2022) Penentuan Jumlah Tenaga Kerja Dan Output Standar Di Zona Drilling Menggunakan Metode Work Sampling Di PT. Pindad (Persero) Bandung. Program Studi Teknik Industri Fakultas Teknik UMS.
PDF (PKM-AI)
D600160098.pdf Download (1MB) |
Abstract
This research was conducted in the machining department, heavy equipment division, PT. Pindad (Persero) Bandung, which plays a role in machining various components. The purpose of this study is to determine the optimal number of workers and the number of standard outputs in the machining process in the drilling zone. The benefits of this research are expected to help the company so that the production process runs smoothly and in accordance with the schedule and production targets that have been made. The method used is work sampling. The data used is the observation data for three days in the drilling zone by recording the productive and unproductive activities of the operator. This method is used to determine the amount of standard time, the amount of standard output and the optimal amount of labor. From the results of research and calculations, the standard time to complete one product unit is 41,057 minutes, the standard output is 10 units / day, and the optimal amount of labor needed is 2 people.
Item Type: | Other |
---|---|
Uncontrolled Keywords: | Jumlah Tenaga Kerja, Output Standar, Work Sampling |
Subjects: | T Technology > TI Industrial Engineering |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Cahyana K. Widada |
Date Deposited: | 25 Aug 2022 06:31 |
Last Modified: | 25 Aug 2022 06:31 |
URI: | http://eprints.ums.ac.id/id/eprint/104534 |
Actions (login required)
View Item |