Strategi Manuver JTM di GI Bringin Salatiga Berdasarkan Tingkat Prioritas Beban

Putro, Dimas Prasetyo and , Aris Budiman, ST. MT. (2018) Strategi Manuver JTM di GI Bringin Salatiga Berdasarkan Tingkat Prioritas Beban. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
1534149840642_Naskah Publikasi D400140027.pdf

Download (543kB)
[img] PDF (Pernyataan Publikasi Ilmiah)
surat pernyataan.pdf
Restricted to Repository staff only

Download (160kB) | Request a copy

Abstract

Analysis of the strategy of maneuver the network used to determine the level of priority that customers into two General and specialized customers customers in determining priority loads. Special customers take precedence over the General customers special because customers pay electric bills are larger than General customers. PT PLN Persero should also prioritize the specific customers rather than General customers and should be ready to disconnect the load on common customers to supply voltage to special customers. This research aims to provide alternative maneuvers on the network-BRG 10 PT PLN Persero Salatiga. Penyulang BRG-10 is the area of the factory or called with special customers and should be treated special by PT PLN Persero. In the event of damage to the BRG-10 penyulang or konslet occurs then the PT PLN should immediately perform a maneuver to BRG-10. The maneuver can be done through networking BRG BRG-2 and-4. ETAP Power Station 12.6 can be used to facilitate the analysis and strategy of maneuver. The results of the simulations obtained using ETAP Power Station 12.6, the maneuver of the BRG-2 with the reduction of the burden of 9.609 MVA on bus 139, 141, and 155 in a ruinous marginally, while maneuvering through the BRG-4 with a total reduction of burden of 7.056 MVA on bus 139, 141, and 155 in a ruinous marginally. Maneuver the network with BRG-4 shows the better shape seen from the reduction of the burden of fewer compared with BRG-2

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: special customer, network maneuver, ETAP Power Station 12.6
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: DIMAS PRASETYO PUTRO
Date Deposited: 13 Aug 2018 09:28
Last Modified: 13 Aug 2018 09:28
URI: http://eprints.ums.ac.id/id/eprint/66309

Actions (login required)

View Item View Item