Analisa Susut Energi Penggunaan Penghantar Tacsr Pada Jaringan Transmisi Tegangan Tinggi 150 kV Pada Gardu Induk Palur – Solobaru Dengan Etap 12.6

Setyawan, Remanda Damas and , Umar, S.T, M.T (2018) Analisa Susut Energi Penggunaan Penghantar Tacsr Pada Jaringan Transmisi Tegangan Tinggi 150 kV Pada Gardu Induk Palur – Solobaru Dengan Etap 12.6. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI perpus fix.pdf

Download (683kB)
[img] PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN PUBLIKASI ILMIAH.pdf
Restricted to Repository staff only

Download (191kB) | Request a copy

Abstract

Transmission of electrical energy from the plant to the transmission of the substations, as well as when transmitting to the distribution, there will be differences in voltage, current and power. Likewise on the transmission channel substation one with the other substations will surely happen the loss of energy or loss of energy (Losses). The loss of energy in an electric must always exist, this is due to the content of prisoners in the conductor used. The goal to be done is to calculate how much loss or power is wasted for the process of transmitting electrical energy in GI channel Palur to GI Solobaru for one month. The method used is to first conduct a survey on the location, looking for the required data such as current, voltage, power, resistance, and channel length on a 150kV transmission line. The retrieval of the data is obtained from the existing control panel on GI Palur. Data collection is done at 10:00 and 19:00 WIB for one month. Using tariff mean method hence researcher can know how much loss of electric power which is in responsibility by PLN. This transmission line type of carrier used is TACSR 480 with resistance of 0.0610 Ω / km. The largest energy losses that occur during the day are 0.06267757 MW, and the lowest energy shrinkage is 0.02113167 MW. The energy shrinkage peak that occurs at night is 0.06748401 MW, otherwise the lowest energy shrinkage occurs of 0.02876255 MW. The total energy losses occurring in January were 39.6857523 MWh, resulting in financial losses incurred by PT.PLN of Rp45,960,863.45.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: Kontrol panel, Susut Energi (losses) , TACSR, Transmisi
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: REMANDA DAMAS SETYAWAN
Date Deposited: 02 Aug 2018 03:46
Last Modified: 02 Aug 2018 03:46
URI: http://eprints.ums.ac.id/id/eprint/64650