Estimasi Biaya Pembangunan Saluran Drainase Dengan “Cost Significant Model” (Studi Kasus Pembangunan Saluran Drainase Di Kabupaten Wonogiri)

Anggrainy, Marya and -, Mochamad Solikin, Ph.D. and -, Purwanti Sri Pudjiastuti, S.T., M.Sc. (2018) Estimasi Biaya Pembangunan Saluran Drainase Dengan “Cost Significant Model” (Studi Kasus Pembangunan Saluran Drainase Di Kabupaten Wonogiri). Thesis thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (NASKAH PUBLIKASI)
NASKAH PUBLIKASI.pdf

Download (1MB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (564kB)
[img] PDF (BAB I)
BAB I.pdf

Download (154kB)
[img] PDF (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (551kB) | Request a copy
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (206kB) | Request a copy
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] PDF (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (203kB) | Request a copy
[img] PDF (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (16MB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (194kB)
[img] PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN.pdf
Restricted to Repository staff only

Download (53kB) | Request a copy

Abstract

The initial stage of the drainage development planning project, in the project funding, cost is not based on the quantity (volume) of work. The purpose of the study is to determine the significant cost to total cost of drainage development, the comparison accuracy of cost estimation model with significant model and model cost in Public Works OfficeWonogiri. The method used is cost significance model and multiple regression model. The results show the cost estimation model is influenced by the cost of layering and concrete work, which has the same significant effect of 98.50% while the rest by other causes. Based on the results equation, then comparing the estimated cost to the actual cost. The accuracy level by using model estimating the cost of drainage development in the sistrict with the method of "Significant Cost Model" is between 22.94% up to + 46.80%, with an average accuracy rate of + 10.45%. The estimation with the "Cost Significant Model" resulted in better data when compared to estimates using the length drainage parameters that have occurred in the Field of Cipta Karya of the Public Works Office of Wonogiri Regency with an accuracy ranging from + 2.61% up to + 19.67% with an average accuracy rate of + 10.76%.

Item Type: Karya ilmiah (Thesis)
Uncontrolled Keywords: cost estimation, cost significant model, drainage
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Pasca Sarjana > Magister Teknik Sipil
Depositing User: MARYA ANGGRAINY
Date Deposited: 03 Aug 2018 06:49
Last Modified: 03 Aug 2018 06:49
URI: http://eprints.ums.ac.id/id/eprint/64607