Analisis Penggunaan Metode Half Slab Terhadap Nilai Biaya Dan Waktu Dalam Pembangunan Proyek Konstruksi (Studi Kasus : Proyek M-Gold Tower Bekasi – Jawa Barat)

Aprisandi, Dasa and ., Mochammad Solikin, PhD. and ., Ir. Muhammad Nur Said, MM., MT. (2018) Analisis Penggunaan Metode Half Slab Terhadap Nilai Biaya Dan Waktu Dalam Pembangunan Proyek Konstruksi (Studi Kasus : Proyek M-Gold Tower Bekasi – Jawa Barat). Thesis thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
02. naskah publikasi.pdf

Download (817kB)
[img] PDF (Halaman Depan)
03. halaman depan.pdf

Download (1MB)
[img] PDF (Bab I)
04. bab 1.pdf

Download (169kB)
[img] PDF (Bab II)
05. bab 2.pdf
Restricted to Repository staff only

Download (357kB) | Request a copy
[img] PDF (Bab III)
06. bab 3.pdf
Restricted to Repository staff only

Download (102kB) | Request a copy
[img] PDF (Bab IV)
07. bab 4.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab V)
08. bab 5.pdf
Restricted to Repository staff only

Download (87kB) | Request a copy
[img] PDF (Daftar Pustaka)
09. DAFTAR PUSTAKA.pdf

Download (152kB)
[img] PDF (Lampiran)
10. lampiran.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Surat Pernyataan Publikasi)
01. surat pernyataan publikasi karya ilmiah.pdf
Restricted to Repository staff only

Download (234kB) | Request a copy

Abstract

The selection of work methods in the construction of high-rise buildings is very influential on the use of cost and time of implementation. One of the work to be done in the construction of a multi-story building is the work of the floor plate structure. The selection of appropriate floor plate method will make the construction of high rise building to be efficient. The method of execution of floor plate used in the construction of the M-Gold Tower Bekasi project is the half slab method. This method is chosen because it is more advantageous in terms of cost and time. The half slab method costs Rp. 7,985,361,365.00. with a 180-day execution time. Meanwhile, if using conventional methods cost Rp. 10,174,649,180 with a time of 300 days. So the use of the half slab method for the floor plate structure is more advantageous than using conventional methods.

Item Type: Karya ilmiah (Thesis)
Uncontrolled Keywords: method, half slab, slab.
Subjects: X General Subject
Divisions: Fakultas Pasca Sarjana > Magister Teknik Sipil
Depositing User: Unnamed user with username s100120012
Date Deposited: 28 May 2018 02:26
Last Modified: 28 May 2018 02:26
URI: http://eprints.ums.ac.id/id/eprint/62687

Actions (login required)

View Item View Item