Evaluasi Kinerja Operasi Dan Pemeliharaan Bendungan Cengklik Dengan Menggunakan Balanced Scorecard

Widiyarto, Agus Eddy and -, Ir. Sri Sunarjono, Ph.D., MT and -, Ir. Isnugroho, CES (2017) Evaluasi Kinerja Operasi Dan Pemeliharaan Bendungan Cengklik Dengan Menggunakan Balanced Scorecard. Thesis thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (1MB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (1MB)
[img] PDF (Bab I)
BAB I.pdf
Restricted to Repository staff only

Download (94kB) | Request a copy
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (604kB) | Request a copy
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (474kB) | Request a copy
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (284kB) | Request a copy
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (88kB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (77kB)
[img] PDF (Lampiran)
Lampiran Update Tesis.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] PDF (Surat Pernyataan)
agus Edy.pdf

Download (549kB)

Abstract

The operation and maintenance of the dam is a very important activity for the dam to work normally, thus providing benefits in accordance with the plan. Operation and scheduling activities that are not in accordance with established procedures will reduce the effectiveness of the dam and may even harm the dam. In this study used Balanced Scorecard (BSC) to assist in measuring operating performance and Determination of Cengklik Dam. BSC method is a method that to improve the ability in its performance on an ongoing basis. Performance measurement for each BKK is of (1) bad value, (2) average, (3) good and good (4) is very good. For performance (3.67), BKK Learning and Development (3.33) and BKK Internal Governance (3.50). These three BKKs are categorized as good. For the performance of BKK Owners of Interest (Stakeholders) (1.50), badly categorized. While the performance of BKK Finance (2.67), categorized as being. Nevertheless overall performance and. Cengklik Dam is categorized well, it is made from average is (3,18).

Item Type: Karya ilmiah (Thesis)
Uncontrolled Keywords: Operation and Maintenance, Balanced Scorecard, Performance Measurement
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Pasca Sarjana > Magister Teknik Sipil
Depositing User: Unnamed user with username s100110038
Date Deposited: 10 Feb 2018 08:05
Last Modified: 22 Feb 2018 01:56
URI: http://eprints.ums.ac.id/id/eprint/60177

Actions (login required)

View Item View Item