Evaluasi Pelaksanaan Dan Pengendalian Proyek Dengan Critical Path Methode (Studi KasusProyek Pembangunan Ruang Raat Inap RSUD Ambarawa)

Zain Maarif, Guntoro and , Mochamad Solikin, S.T., M.T., Ph.D. and , Ir. Nursahid, MM, MT (2017) Evaluasi Pelaksanaan Dan Pengendalian Proyek Dengan Critical Path Methode (Studi KasusProyek Pembangunan Ruang Raat Inap RSUD Ambarawa). Thesis thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (HALAMAN DEPAN)
Halaman Depan.pdf

Download (2MB)
[img] PDF (BAB I)
BAB I.pdf

Download (97kB)
[img] PDF (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (354kB) | Request a copy
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (135kB) | Request a copy
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (711kB) | Request a copy
[img] PDF (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (131kB) | Request a copy
[img] PDF (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (84kB)
[img] PDF (LAMPIRAN)
Lampiran.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf
Restricted to Repository staff only

Download (61kB) | Request a copy
[img] PDF (Naskah Publikasi)
Naskah Publikasi.pdf

Download (1MB)

Abstract

Hospital Inpatient Project Development Ambarawa 2014 still has many shortcomings, especially after 21 weeks running. This study aims to evaluate whether the implementation of the development of inpatient hospitals Ambarawa already according to plan or not, in terms of time and cost as well as controlling time and costs, and rescheduling activities using CPM (Critical Path Method). The cost over run into a material evaluation of the project progressed. Evaluation work was done at week 21 due to research carried out after entering the work week to 21, so there is time remaining five weeks of the contract, the entire 26-week calendar. Realization of the construction of an inpatient hospital Ambarawa until 21 weeks faster 0.2% of the planned schedule. In terms of the cost of realization of the use of funds until week 21 of Rp. 6.784.769 billion, - from planning only costs Rp.5.945.717.347 which means greater expenditure of the budget (cost over run). Furthermore, the control unrealized work with the method of trial four CPM models to find the most optimal time and minimize the risk of delays in the work. The model chosen is the model CPM CPM with the critical path are at least two critical path is a critical path activity lifts and critical path sequence of activities of floor coverings, ceiling and painting with a maximum time duration is 35 days. After rescheduling and use the model to accelerate work, found the total cost of Rp. 7.556.636.614 with efficiency Rp. 10.298.354 of the total contract value of Rp. 7.566.934.868 obtained at the acceleration limit and finishing work.

Item Type: Karya ilmiah (Thesis)
Uncontrolled Keywords: Evaluasi Waktu dan Biaya, Rescheduling, CPM
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Pasca Sarjana > Magister Teknik Sipil
Depositing User: GUNTORO ZAIN M
Date Deposited: 10 Feb 2017 04:06
Last Modified: 10 Feb 2017 04:06
URI: http://eprints.ums.ac.id/id/eprint/49799

Actions (login required)

View Item View Item