Identifikasi Prioritas Value Proyek Konstruksi Di Kota Surakarta

Wijanarko, Awan Bagus (2015) Identifikasi Prioritas Value Proyek Konstruksi Di Kota Surakarta. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
02. Naskah Publikasi.pdf

Download (1MB)
[img] PDF (Halaman Depan)
03. Halaman Depan.pdf

Download (1MB)
[img] PDF (BAB I)
04. BAB I.pdf

Download (140kB)
[img] PDF (BAB II)
05. BAB II.pdf
Restricted to Repository staff only

Download (377kB)
[img] PDF (BAB III)
06. BAB III.pdf
Restricted to Repository staff only

Download (97kB)
[img] PDF (BAB IV)
07. BAB IV.pdf
Restricted to Repository staff only

Download (445kB)
[img] PDF (BAB V)
08. BAB V.pdf
Restricted to Repository staff only

Download (91kB)
[img] PDF (DAFTAR PUSTAKA)
09. DAFTAR PUSTAKA TA.pdf

Download (96kB)
[img] PDF (LAMPIRAN)
10. LAMPIRAN.pdf
Restricted to Repository staff only

Download (2MB)
[img] PDF (PERNYATAAN PUBLIKASI ILMIAH)
01. Surat Pernyataan Publikasi Karya Ilmiah.pdf
Restricted to Repository staff only

Download (591kB)

Abstract

Rancang Bangun Sejahtera is one of construction developer which addressed at Jl. Serang Rt 4 RW 7 Semanggi, Pasar Kliwon Surakarta. The purposes of this research are to give functional and relevant benefits as expectations. To identify basic job elements of construction project with FAST diagram, to identify priority project value by voice of consumers by statistics test, and calculate how much reduction cost RAB can be created after Value Engineering Process in this research. The research with FAST diagram by brainstorming obtains construction project basic job elements that can’t be passed off or minimized. With SPSS, the priority project values by consumers are get in order first to last are continuity progress as scheduled, well communication among stakeholders, payment system, administration, construction strength quality, construction esthetic, the low cost planning. After the basic job elements and value rank are get, then from the reduction cost RAB calculation shows cost reduction up to 27,5%. Not only cost reduction but also relationship between contractor and consumer is improved as the beginning of the contract to avoid failure and loss.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: Construction Project, FAST Diagram, RAB, Value Engineering
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Awan Bagus Wijanarko
Date Deposited: 05 Aug 2015 02:23
Last Modified: 05 Aug 2015 02:23
URI: http://eprints.ums.ac.id/id/eprint/36102

Actions (login required)

View Item View Item